Agro-processing · Chandragiri, Nepal · Completed

650 kg/hr Wood-Fired Steam Boiler - Weaster Agro Farms

Design, supply and commissioning of a 650 kg/hr wood-fired horizontal smoke tube boiler to meet rising process heating demand at Weaster Agro Farms, Chandragiri.

Capacity
650 kg/hr
Sector
Agro-processing
Location
Chandragiri, Nepal
Commissioned
Completed
01 — The Project

ME Engineering supplied and commissioned a 650 kg/hr horizontal smoke tube, 3-pass, wood-fired steam boiler for Weaster Agro Farms in Chandragiri, Nepal, providing stable steam supply for the client's process heating needs.

The horizontal smoke tube, 3-pass design routes hot flue gas from the wood-fired furnace through three passes across the tube bundle, transferring heat efficiently to the boiler water before exhaust - a robust, proven configuration for biomass-fired steam generation.

For Weaster Agro Farms, managed by Mr. Surendra Giri, increasing process heating demand called for a boiler that could deliver stable steam production and better fuel utilisation. ME Engineering's 650 kg/hr unit was designed, supplied, and commissioned to meet this demand, built to IBR standards, helping improve overall plant productivity.

02 — Scope of Supply

What we delivered

01650 kg/hr horizontal smoke tube 3-pass wood-fired steam boiler
02Furnace and fuel feeding arrangement
03Feed water system
04Installation & commissioning
05 — Technical Specification

Equipment & ratings supplied

Boiler typeHorizontal smoke tube, 3-pass
Capacity650 kg/hr
FuelWood (biomass)
Design pressure(confirm with owner)
Working pressure(confirm with owner)
06 — Challenge & Solution
The challenge

Weaster Agro Farms faced increasing process heating demand and needed a steam generation system capable of delivering stable output while improving fuel utilisation over existing arrangements.

Our solution

ME Engineering designed, supplied, and commissioned a 650 kg/hr wood-fired horizontal smoke tube 3-pass boiler, delivering stable steam production and improved fuel efficiency to support the client's growing process heating requirements.