Nepal's First 1000 kg/hr Electric Steam Boiler Installation
Supply, installation and commissioning of Nepal's first 1000 kg/hr electric steam boiler for Goshail Print & Packaging in Pokhara Industrial Estate.
This project involved the supply, installation and commissioning of a 1000 kg/hr (1 TPH) electric steam boiler system for Goshail Print & Packaging at Pokhara Industrial Estate, Nepal. The electric boiler provides clean and efficient steam generation without the use of fossil fuels, supporting industrial processes with reliable steam at required operating pressures and temperatures.
ME Engineering successfully executed this landmark project, recognized as Nepal's first installation of a 1000 kg/hr electric steam boiler. The project demonstrates the growing adoption of energy-efficient and environmentally friendly steam solutions in Nepalese industries. The scope included equipment supply, installation, electrical integration, testing and commissioning to ensure safe and reliable operation. The electric boiler offers reduced emissions, lower maintenance requirements and precise steam control for modern industrial applications. Project Highlights Nepal's first 1000 kg/hr electric steam boiler installation, Clean steam generation with zero on-site combustion, Automated operation and control, Reduced maintenance requirements, Environmentally friendly boiler technology,
What we delivered

On site & in the boiler house





Equipment & ratings supplied

The client required a clean and efficient steam generation system with lower emissions and minimal maintenance for printing and packaging operations.
ME Engineering supplied and commissioned a 1000 kg/hr electric steam boiler system that eliminated on-site fuel combustion while providing reliable steam generation.