Sun–Fri · 09:00–18:00 NPT NEPAL · EN
ME Engineering Private LimitedME EngineeringPrivate Limited · Nepal

ME Engineering Private Limited — Industrial Steam Boiler Manufacturer in Nepal

Company Introduction
Engineering Excellence Since 2004 In Nepal

Nepal's trusted name in steam engineering

Two decades of boiler manufacturing, installation, and process heating solutions built in Nepal, for Nepal.

01 / 03
Code-Guided Boiler EngineeringCode-Guided Boiler Engineering
Environmentally Responsible Manufacturing PracticesEnvironmentally Responsible Manufacturing
IBR-Aligned Engineering PracticesIBR-Aligned Engineering Practices
Strict In-House Quality ControlStrict In-House Quality Control
01 — Who We Are

Built for
pressure.

ME Engineering Pvt. ltd is one of Nepal's leading premier engineering consultancy firms, offering comprehensive multi disciplinary spares parts and utilities machinery solutions for a wide range of projects. ME Engineering provides services for project activities low side , design engineering,procurement assistance, project management and co-ordination, inspection and expediting, construction supervision and commissioning assistance.

During the last decade, ME Engineering has performed the role of Owner's Engineer, Lender's Engineer and Consultant to EPC contractor besides its traditional role of Engineering consultant.

Rishit karki
Managing Director · Founder
22+
Years in operation
// since 2004
500+
Projects completed
// across Nepal
50+
Industries served
// food · pharma · textile
3
Operating Locations
// locations / nationwide
02 // Why specify ME Engineering

Reliability is
designed in.

A boiler is the heart of a plant. When it stops, everything stops. We don't sell hardware — we deliver guaranteed steam, with the engineering, compliance and service to keep it flowing.

99.4%
Fleet uptime
< 24 h
Service response
10 yr
Pressure-part warranty
01

Engineered, not assembled

Thermal and stress calculations done in-house — sized to your load, not pulled from a catalogue.

02

In-house fabrication

Plate rolling, welding and hydro-testing under one roof. Full traceability on every weld.

03

IBR-aligned Engineering Practices

Every pressure vessel certified and documented — inspection-ready from day one.

04

Service within 24 hours

A nationwide field team and stocked spares mean breakdowns are measured in hours, not weeks.

03 // Product range

Engineered for
the boiler room.

Full catalogue
SS304 Steam Jacketed Kettle
PRD-01

SS304 Steam Jacketed Kettle

Capacity 100-2000 LitersProduct Contact Material SS304 stainless steelHeating Type Indirect steam jacket heating
Electric Steam Boiler
PRD-03

Electric Steam Boiler

Heating Type Electric heating elementsSteam Capacity (confirm with owner)Operation Automatic / Semi-automatic
Vertical Cross Tube Water Tube Internal Furnace Steam Boiler (1000 kg/hr)
PRD-04

Vertical Cross Tube Water Tube Internal Furnace Steam Boiler (1000 kg/hr)

Capacity 1000 kg/hrMaximum Working Pressure 10 barBoiler Type Vertical cross tube water tube
Horizontal Smoke Tube 3-Pass Internal Furnace Steam Boiler (300-400 kg/hr)
PRD-05

Horizontal Smoke Tube 3-Pass Internal Furnace Steam Boiler (300-400 kg/hr)

Capacity 300-400 kg/hrMaximum Working Pressure 5 barBoiler Type Horizontal smoke tube
Horizontal Smoke Tube 3-Pass Internal Furnace Steam Boiler (500-600 kg/hr)
PRD-06

Horizontal Smoke Tube 3-Pass Internal Furnace Steam Boiler (500-600 kg/hr)

Capacity 500-600 kg/hrMaximum Working Pressure 7.5 barBoiler Type Horizontal smoke tube
Boiler fittingENGINEERING DETAIL — weld / valve / gauge macro
Built to outlast the plant

Every weld
x-rayed.

Pressure parts are radiographically inspected and hydro-tested to 1.5× working pressure before a single unit leaves Balaju. We build for decades of continuous duty — not the warranty period.

1.5×
Hydro-test pressure
100%
Radiographic weld inspection
What our clients say

Trusted across
the plant floor.

01 / 02

ME Engineering provided exceptionally fast delivery of the original product, which perfectly matched our industrial requirements and immediately integrated into our plant setup.

CLIENT PHOTO — Dikshan Gurung
Dikshan Gurung

The technical team resolved our system pressure issue on-site within hours, and their proactive maintenance has ensured zero unexpected shutdowns during our peak production season.

Manish Karki — ME Engineering client
Manish Karki
Plant Manager

We noticed a measurable drop in our monthly fuel costs immediately after installing their high-efficiency steam piping layout and moisture separators.

Suraj Gautam — ME Engineering client
Suraj Gautam
Plant Operator
06 // Get a quote

Talk to an
engineer.

Tell us your steam load and fuel, and we'll size a system and send a budgetary quote — usually within two working days.

Phone+977 9802827776, +977 9766382655
EmailInfo@boilersnepal.com, Sales@boilersnepal.com, sbkarki203@boilersnepal.com, rishitkarki@boilersnepal.com
Head OfficeBharatpur -10, state- 3 Chitwan,NepalGet directions
BranchNew colony Dhobighat LalitpurGet directions
BranchLaliguras tole Pokhara-12 kaskiGet directions
Request a quote
We reply within 2 working days. No spam — your details stay with our sales desk.