Banbhori Pvt. Ltd. - 3000 kg/hr Steam Boiler Supply & Commissioning
kalankisthan Rd, Kathmandu · Completed

Banbhori Pvt. Ltd. - 3000 kg/hr Steam Boiler Supply & Commissioning

Supply, installation and commissioning of a 3000 kg/hr steam boiler system for Banbhori Pvt. Ltd. to support reliable industrial steam generation.

Capacity
3000 kg/hr (3 TPH)
Location
kalankisthan Rd, Kathmandu
Commissioned
Completed
01 — The Project

This project involved the supply, installation and commissioning of a 3000 kg/hr (3 TPH) industrial steam boiler system for Banbhori Pvt. Ltd. The boiler plant was designed to provide reliable steam generation for industrial processes while maintaining safe and efficient operation at specified steam pressures and temperatures.

ME Engineering delivered a complete boiler solution including site installation, system integration and commissioning support. The project focused on ensuring dependable steam supply, operational safety and long-term reliability. Our engineering team coordinated equipment delivery, erection, testing and operator guidance to ensure smooth plant startup and stable performance.

Project Highlights Supply of complete steam boiler system Site installation and erection support Mechanical and electrical integration Performance testing and commissioning Operator training and handover support

02 — Scope of Supply

What we delivered

013000 kg/hr steam boiler
Banbhori Pvt. Ltd. - 3000 kg/hr Steam Boiler Supply & Commissioning equipment
06 — Challenge & Solution
Before
The challenge

The client required a reliable steam generation system capable of supporting continuous industrial operations with safe and efficient performance.

Our solution

ME Engineering supplied and commissioned a 3000 kg/hr steam boiler system with supporting accessories and on-site technical services to ensure smooth plant operation.