Supply, installation and commissioning of a 6000 kg/hr steam boiler system for an industrial fabrication facility to ensure reliable steam generation and efficient plant operation.
A 6000 kg/hr steam boiler plant designed to generate steam for industrial process applications in a fabrication facility. The system provides reliable steam generation for production processes while improving operational efficiency and ensuring safe boiler operation.
ME Engineering carried out the supply, installation and commissioning of the steam boiler system, including auxiliary equipment and site integration. The project was executed to deliver dependable steam production, simplified maintenance and long-term operational reliability. Our engineering team ensured proper installation, testing and performance verification before handover to the client.
What we delivered

On site & in the boiler house




Equipment & ratings supplied

The client required a reliable steam generation system integrated into existing plant operations while minimizing installation downtime.
ME Engineering supplied and commissioned a 6000 kg/hr steam boiler system with supporting utilities and site integration to ensure safe and efficient operation.