+977 1 4350121 boilersnepal@gmail.comSun–Fri · 09:00–18:00 NPT NEPAL · EN
ME Engineering Private LimitedME EngineeringPrivate Limited · Nepal
Distillery steam plant
Distillery · Biratnagar, Nepal · Completed June 2026

Distillery steam plant

12 TPH biomass-fired steam plant for a distillery, currently in fabrication.

Capacity
12 TPH
Sector
Distillery
Location
Biratnagar, Nepal
Commissioned
2026
01 — The Project

ME Engineering designed, fabricated and commissioned a 12 TPH biomass-fired steam plant for a distillery client in Biratnagar, Nepal. The plant supplies continuous process steam for distillery operations using locally available biomass fuel.

Project Scope

  • Steam output: 12 TPH
  • Fuel type: Biomass-fired
  • Scope: Design, engineering, fabrication, supply and commissioning
02 — Scope of Supply

What we delivered

0112 TPH biomass-fired steam boiler
02Boiler engineering and design
03Feed water tank system
04Chimney and ducting system
05Installation and commissioning
Distillery steam plant equipment
04 — Project Timeline

Enquiry to handover

PhaseCommissioning
W4W8W12W16W20W24
Engineering & design
W14
Procurement
W36
Fabrication
W516
Site erection
W1722
Commissioning & handover,
W2328
05 — Technical Specification

Equipment & ratings supplied

Steam output12 TPH
Fuel typeBiomass-fired
Project scopeDesign, engineering, fabrication, supply and commissioning
06 — Challenge & Solution
Before
The challenge

The distillery required a dependable source of process steam capable of supporting continuous production while controlling fuel costs and improving energy efficiency.

Our solution

ME Engineering supplied a complete 12 TPH biomass-fired steam plant engineered for continuous industrial operation, incorporating reliable steam generation equipment and supporting systems.

07 — Results
12 Tph
Steam generation capacity
Delivered for continuous distillery operation
The technical team resolved our system pressure issue on-site within hours, and their proactive maintenance has ensured zero unexpected shutdowns during our peak production season.
Manish Karki
Plant Head
08 — Project Team

Engineers on the job

SG
Saughat ghimire
Project Lead
DG
Dikshan Gurung
Engineer
AG
Ashim Gurung
Supporting Staff

Planning a steam plant?

Tell us your steam load & fuel — budgetary quote in two working days.