1000 kg/hr pressure reducing station installed at HOF Foods & Beverage in Gaindakot Pressure reducing valve with gauges and safety valve on a steam pressure reducing station ME Engineering team erecting a steam pressure reducing station at a food and beverage plant
Food & Beverage · Gaindakot, Gandaki Province, Nepal · Completed

HOF Foods & Beverage - 1000 kg/hr Pressure Reducing Station, Gaindakot

Supply and erection of a 1000 kg/hr pressure reducing station for HOF Foods & Beverage in Gaindakot, Gandaki Province, Nepal.

Capacity
1000 kg/hr
Sector
Food & Beverage
Location
Gaindakot, Gandaki Province, Nepal
Commissioned
Completed
01 — The Project

ME Engineering supplied and erected a 1000 kg/hr pressure reducing station for HOF Foods & Beverage in Gaindakot, Gandaki Province, Nepal. A pressure reducing station lowers high-pressure steam from the boiler to the steady, lower pressure that process equipment needs. It protects downstream equipment and gives the plant stable, controlled steam.

Why a pressure reducing station matters

  • Stable process pressure: the station holds steam at a constant set pressure, even when boiler pressure or load changes.
  • Equipment protection: it keeps high-pressure steam away from equipment designed for lower pressure.
  • Safer operation: a safety valve and gauges on the outlet side guard against over-pressure.
  • Better steam use: correct pressure at the point of use helps processes run consistently.

What ME Engineering delivered

  1. Supply of the 1000 kg/hr pressure reducing station.
  2. Erection and installation at the client's site in Gaindakot.

Inlet pressure, outlet pressure and station components: (confirm with owner).

Photo suggestion: the pressure reducing station installed on site, and a close-up of the pressure reducing valve, gauges and safety valve.

02 — Scope of Supply

What we delivered

011000 kg/hr pressure reducing station
02Erection and installation at site
05 — Technical Specification

Equipment & ratings supplied

EquipmentPressure reducing station
Capacity1000 kg/hr
06 — Challenge & Solution
Our solution

ME Engineering supplied and erected a 1000 kg/hr pressure reducing station to deliver steam at a controlled pressure to the plant.