
Pokhara Noodles - Comprehensive Steam Audit
Comprehensive steam audit conducted for 8 TPH and 10 TPH boiler systems at Pokhara Noodles to assess efficiency, steam utilization and energy-saving opportunities.
A comprehensive steam audit of 8 TPH and 10 TPH boiler systems conducted to evaluate boiler efficiency, steam distribution, condensate recovery and overall energy performance. The audit helps identify steam losses, improve fuel efficiency and optimize plant operation.
ME Engineering carried out a detailed assessment of the steam generation and distribution system at Pokhara Noodles. The study included performance measurements, operational analysis and recommendations for efficiency improvement. The audit aimed to reduce energy consumption, improve steam utilization and enhance the reliability of the boiler plant.
What we delivered

On site & in the boiler house





Equipment & ratings supplied

The client required a detailed assessment of steam generation and consumption to identify energy losses and improve operational efficiency.
ME Engineering conducted a comprehensive steam audit covering boiler performance, steam distribution and condensate recovery, providing actionable recommendations for optimization.
Planning a steam plant?
Tell us your steam load & fuel — budgetary quote in two working days.


