Thermax RXB 600 steam generator installed at a pharmaceutical factory in Nepal Control panel and gauges of a Thermax RXB 600 steam generator ME Engineering team erecting a steam generator at a pharmaceutical plant
Pharmaceutical · Completed

Pharmaceutical Factory - Thermax RXB 600 Steam Generator

Supply, erection, testing and commissioning of a Thermax RXB 600 steam generator for a pharmaceutical factory in Nepal.

Sector
Pharmaceutical
Commissioned
Completed
01 — The Project

ME Engineering supplied, erected, tested and commissioned a Thermax RXB 600 steam generator for a pharmaceutical factory in Nepal. The steam generator supplies steam for the factory's process and utility needs. Pharmaceutical plants need steady, controlled steam, so the equipment must be installed correctly and proven by testing before handover.

Why steam matters in a pharmaceutical plant

  • Consistent supply: process heating and utility services depend on steady steam pressure.
  • Controlled operation: safe, automatic operation helps meet the plant's quality and safety requirements.
  • Proper installation: correct erection, piping and safety fittings protect both people and production.

What ME Engineering delivered

We handled the project from supply through to handover:

  1. Supply of the Thermax RXB 600 steam generator.
  2. Erection and installation at the client's site.
  3. Testing of the steam generator, controls and safety fittings.
  4. Commissioning and handover to the client's operators.

Capacity, design pressure and fuel: (confirm with owner).

Photo suggestion: the steam generator installed in the plant room, and a close-up of the control panel and gauges.

02 — Scope of Supply

What we delivered

01Thermax RXB 600 steam generator
02Erection and installation at site
03Testing
04Commissioning
05 — Technical Specification

Equipment & ratings supplied

Model Thermax RXB 600 steam generator

Planning a steam plant?