Sun–Fri · 09:00–18:00 NPT NEPAL · EN
ME Engineering Private LimitedME EngineeringPrivate Limited · Nepal
Industrial sanitation / cleaning · Chitwan, Nepal · Completed

SS 304 Electric Hot Water Cleaning Tank - Creation Ventures

Supply, installation, testing and commissioning of an SS 304 electric hot water cleaning tank for industrial sanitation requirements at Creation Ventures, Chitwan.

Sector
Industrial sanitation / cleaning
Location
Chitwan, Nepal
Commissioned
Completed
01 — The Project

ME Engineering supplied, installed, tested, and commissioned an SS 304 stainless-steel electric hot water cleaning tank for Creation Ventures in Chitwan, Nepal, built to meet industrial sanitation and cleaning requirements.

The tank is constructed from SS 304 stainless steel for corrosion resistance and hygiene, with electric heating to produce hot water on demand for industrial cleaning duties. This combination gives a durable, easy-to-clean system suited to food-grade and general industrial sanitation applications.

For Creation Ventures, this meant a dependable hot water cleaning system that met sanitation standards without the complexity of a fired boiler. ME Engineering handled the full scope - supply, installation, testing, and commissioning - to bring the system into service.

02 — Scope of Supply

What we delivered

01SS 304 electric hot water cleaning tank
02Electric heating elements
03Installation, testing & commissioning
05 — Technical Specification

Equipment & ratings supplied

Tank materialSS 304 stainless steel
Heating typeElectric
06 — Challenge & Solution
The challenge

Creation Ventures needed a reliable hot water cleaning system built to industrial sanitation standards, using hygienic, corrosion-resistant materials suited to cleaning applications.

Our solution

ME Engineering supplied, installed, tested, and commissioned an SS 304 stainless-steel electric hot water cleaning tank, giving the client a durable, hygienic system for industrial sanitation and cleaning needs.

Planning a steam plant?

Tell us your steam load & fuel — budgetary quote in two working days.